Railway crossings blocked: Blackout activates rail boom gates

January 8 2019 - 4:05pm
SET-OFF BY STORM: Traffic was diverted away from the level crossing at Summer Street when the crossing was activated on Monday night.
SET-OFF BY STORM: Traffic was diverted away from the level crossing at Summer Street when the crossing was activated on Monday night.

Traffic was stopped at rail crossings in Summer, Byng and Dalton street after boom gates were activated due to power outages during a large thunderstorm on Monday night.

Subscribe now for unlimited access.

$0/

(min cost $0)

or signup to continue reading

See subscription options

Get the latest Orange news in your inbox

Sign up for our newsletter to stay up to date.

We care about the protection of your data. Read our Privacy Policy.